Prior to performing this procedure:
Refer to Required equipment and Before you begin in this chapter.
Verify the work instruction specify the parameters and values to be provisioned.
Complete the following steps to provision pluggable transmission modules.
1 |
From the System View window, select Configuration → Equipment. Result: The Configure Equipment window opens. |
2 |
Find the circuit pack with the pluggable transmission modules being provisioned, then expand the equipment list by clicking on the plus (+) sign next to the required circuit pack. Select the required PTM and click Select. Result: The pluggable transmission module parameters appear. |
3 |
Provision the required pluggable transmission module parameters according to the work instructions, then click Apply if changes were made. If no changes were made, click Close to exit. Result: A dialog box may appear asking you to confirm executing this command. Click Yes to apply the changes. Click Close to exit. If the Maintenance State parameter is provisioned to Maint, Pluggable transmission module maintenance IP and ABN condition are reported. While in the Maintenance state, any subsequent removal of the pluggable transmission module is reported with an alarm severity level no higher than a standing condition regardless of the assigned ASAP alarm severity level. Changing the Maintenance state does not affect the alarm severity level of any existing removal alarms. |
4 |
If required, repeat this procedure to provision other pluggable transmission modules. End of steps |