OAM-PM Bins and Delay report

OAM-PM Bins and Delay report overview

The OAM-PM Bins and Delay report shows an OAM-PM session with a bin count bar graph and a delay line overlay.

Use cases

QoS analysis—Identify potential performance or SLA impact for a service or composite service

Report inputs

The following table shows the report inputs.

Table 13-4: OAM-PM Bins and Delay report inputs

Prompt

Notes

Session Type

ETH-CFM Session, TWAMP-Light Session

End Date

Calendar date or relative date (for example, two days ago) and time

Granularity

Aggregation types:

  • Hourly

  • Daily

  • Monthly

  • None (raw collection interval)

Report range

Length of time to be reported, in hours, days, or months

Session name

Search using partial names, full names, or IP addresses.

Bin Type

  • Frame Delay—The Avg Delay, Min Delay, and Max Delay in the report output is the delay in microseconds

  • Frame Delay Range—The Avg Delay, Min Delay, and Max Delay in the report output is the delay range in microseconds

  • Inter Frame Delay Variation—The Avg Delay, Min Delay, and Max Delay in the report output is the delay variation (jitter) in microseconds

Interval Duration

5 minutes, 15 minutes, 1 hour, or 1 day

Delay Type

Maximum, average, or minimum

Report characteristics

The following table lists the principal report characteristics.

Table 13-5: OAM-PM Bins and Delay report characteristics

Characteristic

Value

Data type

OAM PM statistics

Source database

Auxiliary database

NE types supported

7210 SAS-M 24F, 7210 SAS-M 24F 2XFP, 7210 SAS-M 24F 2XFP ETR, 7210 SAS-T 12F 10T 4XFP, 7210 SAS-T 12F 10T 4XFP ETR, 7210 SAS-X 24F 2XFP, 7210 SAS-K, 7210 SAS-R6, 7210 SAS-R12, 7210 SAS-S/SX 1/10GE VC

7250 IXR-6, 7250 IXR-R6, 7250 IXR-s, 7250 IXR-10, 7250 IXR-e

all 7450 ESS variants

all 7750 SR variants

all 7950 XRS variants

Drill-down support

No

Examples

The following figures show report examples.

Figure 13-4: ETH-CFM OAM Bins and Delay report
ETH-CFM OAM Bins and Delay report
Figure 13-5: TWAMP-Light OAM Bins and Delay report
 TWAMP-Light OAM Bins and Delay report