OAM-PM Service Site report
Overview
An OAM-PM Service Site report can be run by itself or as a drill-down from an OAM-PM Service Site Summary report. The report shows the aggregate view of the set of sessions on a selected service.
The report includes the following session types:
The following service types are supported:
Use cases
QoS analysis—Identify potential service impacting issues based on thresholds for latency, jitter and packet loss between specific NEs.
Troubleshooting—Troubleshoot service performance by service and segment
Prerequisites
The following need to be performed in the NFM-P for OAM-PM Service Site reports to be created:
-
A TWAMP-Light session must be defined with accounting enabled.
-
For session loss information to be available, an SLM session must also be defined.
Report inputs
The following table shows the report inputs.
Table 13-18: OAM-PM Service Site report inputs
Report characteristics
The following table lists the principal report characteristics.
Table 13-19: OAM-PM Service Site report characteristics
Characteristic |
Value |
---|---|
Data type |
OAM session statistics |
Source database |
Auxiliary database |
NE types supported |
7210 SAS-M 24F, 7210 SAS-M 24F 2XFP, 7210 SAS-M 24F 2XFP ETR, 7210 SAS-T 12F 10T 4XFP, 7210 SAS-T 12F 10T 4XFP ETR, 7210 SAS-X 24F 2XFP, 7210 SAS-K, 7210 SAS-R6, 7210 SAS-R12, 7210 SAS-S/SX 1/10GE VC 7250 IXR-6, 7250 IXR-R6, 7250 IXR-s, 7250 IXR-10, 7250 IXR-e all 7450 ESS variants all 7750 SR variants all 7950 XRS variants |
Drill-down support |
Yes:
|
Example
The following figures show report examples.