How do I schedule a report?
Purpose
Perform this procedure to configure a schedule. You can schedule reports to run once or to repeat.
Steps
1 |
Open Data Collection and Analysis Visualizations, Repository. |
2 |
From the Results folder, right-click on a report or report version and choose Schedule. The Scheduled Jobs page opens. |
3 |
In the Scheduled Jobs page, click Create Schedule. The New Schedule page opens. |
4 |
In the Schedule panel, configure the scheduled start of the job, and the recurrence. |
5 |
Click Parameters to set the input parameters for the scheduled report. If you are scheduling a saved report version, the input parameters will already be set. |
6 |
Click Output Options to set the report format, for example, PDF, and where it will be saved. |
7 |
Click Notifications to configure notification of job status, success, or failure, or for email copies of the report to be sent. |
8 |
Click Save to add your scheduled job to the Schedules page. End of steps |