CPAM and vCPAA
Scaling guidelines for CPAM and vCPAA
The following section outlines the tested limits for the CPAM component of NFM-P.
Note: All CPAAs monitoring a contiguous network must belong to the same administrative domain.
The scalability of 7701 CPAA Hardware revision 2 and vCPAA is described in the following table.
Table 5-29: 7701 CPAA Hardware revision 2 and vCPAA scalability
Item description |
Scaling |
---|---|
Maximum Number of Routers Supported with both IGP and BGP turned-on in the same 7701 CPAA (larger node count must use two separate 7701 CPAAs for IGP and BGP) with 2 200 000 BGP combined routes |
500 |
Maximum Number of IGP Routers per 7701 CPAA if BGP is deployed on separate 7701 CPAA (routers can all be in one or multiple areas and count includes Nokia P/PE & 3rd party routers) |
700 |
Maximum Number of OSPF Domains/Areas per 7701 CPAA |
One Administrative Domain per 7701 CPAA Up to 50 areas per 7701 CPAA |
Maximum Number of ISIS regions/area IDs per 7701 CPAA |
One Administrative Domain per 7701 CPAA Up to 32 L1s + L2 per 7701 CPAA |
Maximum Number of iBGP Peers mesh/RR |
170 |
BGP/ MP-BGP Route Count |
4 000 000 combined |
Maximum Number of IPv4/VPN IPv4 Monitored Prefixes (combined) |
2000 configured 2000 monitored |
Maximum number of Sub-ASes |
1 |
BGP stats |
48 000/5 minutes 144 000/15 minutes |
IP (LDP LSP, GRE, IP) Path Monitor – Configured |
20 000 |
The scalability of CPAM is described in the following table.
Table 5-30: CPAM scalability
Item description |
NFM-P 23.11 |
---|---|
Maximum number of routers per admin domain |
4000 |
Maximum Active 7701 CPAAs |
40 |
Maximum Number of IGP Routers |
12 000 |
Maximum Number of OSPF Domains/Areas |
150 |
Maximum Number of ISIS regions/area IDs |
50 |
Maximum Number of BGP/MP-BGP Routes |
4 000 000 combined |
Maximum number of Sub-ASes |
40 |
BGP stats |
48 000/5 minutes 144 000/15 minutes |
Combined IP and LSP path monitors configured |
The numbers below can be combined (60 000) |
RSVP LSP Path Monitored – Configured |
60 000 |
IP (LDP LSP, GRE, IP) Path Monitor – Configured |
20 000 |
Recommended LSP Path monitor statistics polling interval |
15 min |
Maximum NFM-P database space allocated for IGP Checkpoints |
10 GB |
Maximum number of supported paths (IP / LSP) that can be imported into Simulated Impact Analysis simultaneously |
20 000 |