To configure the BFD flap detection interval on an NE

Steps
 
1 

On the equipment tree, right-click on an NE and choose Properties. The Network Element (Edit) form opens.


2 

Click on the Globals tab, then on the BFD tab.


3 

Configure the Operational State Transition Interval (seconds) parameter.


4 

Save your changes and close the form.

End of steps