OAM-PM Bins (NSP) report
OAM-PM Bins (NSP) report overview
The OAM-PM Bins (NSP) report differs from the OAM-PM Bins report by additionally including OAM data for NEs managed using model-driven mediation. The report shows a distribution count of the PM bins in use. To use this report, a bin policy must be distributed, PM sessions must be configured for each bin, and PM sessions must be active and enabled.
Use cases
SLA reporting—Identify potential impact to service level agreements.
QoS analysis—Identify potential performance impact for a selected bin group.
Prerequisites
The following sessions need to be performed in the NSP and NFM-P for the report to be created:
-
a DMM session must be defined with accounting enabled in both the MDM-managed and NFM-P NEs
-
a TWAMP-Light session must be defined with accounting enabled in both the MDM-managed and NFM-P NEs
-
You must enable aggregation using NSP. For more information, see the Telemetry information on the Network Developer Portal and the NSP Data Collection and Analysis Guide.
Report inputs
The following table shows the report inputs.
Table 18-3: OAM-PM Bins (NSP) report inputs
Report characteristics
The following table lists the principal report characteristics.
Table 18-4: OAM-PM Bins (NSP) report characteristics
Characteristic |
Value |
---|---|
Data type |
OAM testing |
Source database |
Auxiliary database |
NE types supported |
all 7750 SR variants all 7450 ESS variants all 7950 XRS variants 7210 SAS-M 24F, 7210 SAS-M 24F 2XFP, 7210 SAS-M 24F 2XFP ETR, 7210 SAS-Mxp, 7210 SAS-T 12F 10T 4XFP, 7210 SAS-T 12F 10T 4XFP ETR, 7210 SAS-X 24F 2XFP, 7210 SAS-K, 7210 SAS-R6, 7210 SAS-R12, 7210 SAS-S/SX 1/10GE VC |
Aggregation types |
— |
Drill-down support |
No |
Example
The following figure shows a report example.