Ping Latency report

Overview

A Ping Latency report can be run by itself or as a drill-down from a Ping Network Site Summary report. The report shows the graph of latency for a selected test during a specified time period.

The report includes the following test types:

Use cases

QoS analysis—Identify potential service impacting issues based on thresholds for latency, jitter, and packet loss between specific NEs.

Report inputs

The following table shows the report inputs.

Table 13-38: Ping Latency report inputs

Prompt

Notes

Test Type

ETH-CFM Two-Way Delay, ICMP Ping, VCCV Ping, LSP Ping, Tunnel Ping

End Date

Calendar date or relative date (for example, two days ago) and time

Granularity

Aggregation types:

  • None (raw collection interval)

  • Hourly

  • Daily

  • Monthly

Report range

Length of time to be reported, in minutes (minutes, min), hours (hours, h), days (days, d), or months (months, m)

Forwarding Class

The list of forwarding classes configured in NSP Classic management. Search using partial or full names.

Source Node

Search using partial or full names.

Select individual items or click Select All.

Both the NE name and its IP address display.

Target Node

Test

Number of results to report

Threshold

Specify in bps/Kbps/Mbps/Gbps

Report characteristics

The following table lists the principal report characteristics.

Table 13-39: Ping Latency report characteristics

Characteristic

Value

Data type

OAM testing

Source database

Auxiliary database

NE types supported

7210 SAS-M, 7210 SAS-X, 7210 SAS-Mxp, 7210 SAS-R12, 7210 SAS-R6, 7210 SAS-T, 7210 SAS-S, 7210 SAS-Sx, 7210 SAS-K12, 7210 SAS-K30, 7210 SAS-S/SX 1/10GE VC

7250 IXR-6, 7250 IXR-R6, 7250 IXR-s, 7250 IXR-10, 7250 IXR-e

all 7450 ESS variants

all 7705 SAR variants

all 7750 SR and VSR variants

all 7950 XRS variants

OS 6860, OS 6450, OS 6900

OS 6860, OS 6450, and OS 6900 support ETH-CFM Two-Way Delay and ICMP Ping tests only.

7705 SAR-Hm and 7705 SAR-Hmc support ICMP Ping tests only.

Contact Nokia for information about compatibility with specific NE releases.

Drill-down support

No

Example

The following figures show report examples.

Figure 13-50: ETH-CFM Two Way Delay Results Latency report
ETH-CFM Two Way Delay Results Latency report
Figure 13-51: ICMP Ping Results Latency report
ICMP Ping Results Latency report
Figure 13-52: VCCV Ping Results Latency report
VCCV Ping Results Latency report
Figure 13-53: LSP Ping Results Latency report
LSP Ping Results Latency report
Figure 13-54: Tunnel Ping Results Latency report
Tunnel Ping Results Latency report