Procedure 5-132: Clear "Squelch Data Unavailable" alarm

- Overview

This procedure is used to clear a Squelch Data Unavailable alarm.

- Before you begin

Prior to performing this procedure:

  1. Refer to Before you begin and Required equipment in this chapter.

  2. Refer to Laser safety and Electrostatic discharge in Chapter 1, Safety.

Steps

Complete the following steps to identify and clear a Squelch Data Unavailable alarm.

 
1

From the WaveStar® CIT System View, click the Alarm List button and locate the Squelch Data Unavailable alarm in the resulting alarm list and note the corresponding AID.


2

Are DCC-related alarms present in the alarm list?

If...

Then...

Yes

Proceed to the appropriate procedure to clear each alarm in order of severity. Then continue with the next step.

No

Proceed to Step 5.


3

From the System View, click the Alarm List button and click Refresh.


4

Is the Squelch Data Unavailable alarm still present?

If...

Then...

Yes

Continue with the next step.

No

STOP! End of Procedure.


5

From the System View, select Reports → Remote NE Alarm List.

Result:

The Remote NE Alarm List window opens.


6

Are DCC-related alarms present on the remote network elements?

If...

Then...

Yes

Log in to the remote network element and clear all alarms in order of severity. Then continue with the next step.

No

Proceed to Step 9.


7

From the System View, click the Alarm List button and click Refresh.


8

Is the Squelch Data Unavailable alarm still present?

If...

Then...

Yes

Continue with the next step.

No

STOP! End of Procedure.


9

From the System View, select View → Rings → Circuit.

Result:

The View Circuit window opens.


10

In the View Circuit window, locate missing cross-connections at some point in the circuit and record the TID of that node. Click Close on the View Circuit window.


11

Log in to a remote NE with the missing or incorrect cross-connection.


12

From the System View, select Configuration → Cross-Connections to access the Cross-Connection Wizard and provision a new (missing) cross-connection in the circuit or to modify the existing cross-connection.


End of steps

November 2011Copyright © 2011 Alcatel-Lucent. All rights reserved.