Prior to performing this procedure:
Refer to Before you begin and Required equipment in this chapter.
Refer to Electrostatic discharge in Chapter 1, Safety.
Complete the following steps to clear a Subshelf Communication Failed alarm.
1 |
Important! The LAN3 connection, identified as DLAN on the back of a shelf, or the control communications link between the main shelf and each subshelf failed. To support more than one subshelf, the LAN3 port of the main shelf and of each subshelf must be connected to an Ethernet hub capable of supporting 100Mb operation. No special cable is required. Visually check the control link connections between the shelf backplane DLAN connectors and the Ethernet hub (if equipped) for faulty connections or damage.
| ||||||
2 |
| ||||||
3 |
Important! When the shelf is in the Maintenance Mode state, the IND display on the SYSCTL circuit pack faceplate shows MPx.x (where x.x is the generic number). If the shelf is in the Maintenance Mode state, the default User IDs/passwords must be used to log in to the shelf. LUC01, LUC02, and LUC03 are the default privileged User IDs, and DMX2.5G10G is the default privileged password. If required, perform the following to log in to the affected subshelf using the WaveStar® CIT TL1 Cut-Tthrough Mode.
Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) TL1 Message Details, 365-372-306 | ||||||
4 |
Execute the init-system (phase 3) TL1 command to reset the subshelf. Result: The shelf resets and you are logged off the system. A flashing b in the IND display on the SYSCTL indicates that a boot is in progress. During the boot, the b may extinguish for up to 20 seconds and then resume flashing. Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) TL1 Message Details, 365-372-306 | ||||||
5 |
Important! The provisioned User IDs/passwords must be used to log in to the shelf. When the reset is complete, log back into the shelf. Reference: Procedure 6-2: Connect Personal Computer (PC) and establish WaveStar® CIT session STOP! End of Procedure. | ||||||
6 |
Log in to the main shelf using the WaveStar® CIT and select View → Equipment to access each subshelf. Verify that the subshelf information is provisioned correctly. If required, select Configuration → Equipment to access the subshelves and reprovision the subshelf information correctly. | ||||||
7 |
From the System View, select Fault → Reset → System Controller. Result: The Reset System Controller window opens. | ||||||
8 |
Important! Do NOT select Restore the system-level parameters to their default values (Phase 9) on an in-service system. Phase 9 resets all provisionable parameters to the default values and the system controller executes a full power-up sequence. Click Reset the system software without changing parameters (Phase 3). Click OK. Result: A warning appears asking you to confirm executing this command. | ||||||
9 |
Click Yes to execute the command. Result: The system resets and you are logged off the system. A flashing b in the IND display on the SYSCTL indicates that a boot is in progress. During the boot, the b may extinguish for up to 20 seconds and then resume flashing. | ||||||
10 |
Important! The provisioned User IDs/passwords must be used to log in to the shelf. When the reset is complete, log back into the shelf. Reference: Procedure 6-2: Connect Personal Computer (PC) and establish WaveStar® CIT session End of steps |
November 2011 | Copyright © 2011 Alcatel-Lucent. All rights reserved. |