This section summarizes basic system planning and engineering information to plan procurement and deployment of Alcatel-Lucent 1850 TSS-5. There are a number of considerations that should be kept in mind when planning the Alcatel-Lucent 1850 TSS-5's role in the network. Projected customer requirements will determine initial capacity needed, as well as evolution to higher capacities. The advanced networking capabilities of the Alcatel-Lucent 1850 TSS-5 offer many economic and planning benefits, and certain guidelines should be followed to maximize these benefits. Physical installation considerations will be guided by the installation location (central office, uncontrolled, or customer locations). Initial network configuration will determine synchronization requirements. Synchronization should be planned on a network basis considering items like topology, reliability, network connectivity, and service evolution.
Power and electrical requirements
Network synchronization environment
SONET/SDH network configurations
Synchronous Ethernet network configurations
Synchronization status messaging
Sync messaging feature details and options
IS-IS Level 2 routing guidelines
IS-IS Level 2 routing remote provisioning sequence
Copyright © 2011 Alcatel-Lucent. All rights reserved. |