OAM-PM Bins and Delay (NSP) report
OAM-PM Bins and Delay (NSP) report overview
The OAM-PM Bins and Delay (NSP) report differs from the OAM-PM Bins and Delay report by including OAM data for NEs managed by the NFM-P and MDM (model-driven Nokia NEs). The report shows an OAM-PM session with a bin count bar graph and a delay line overlay.
Use cases
QoS analysis—Identify potential performance or SLA impact for a service
Prerequisites
The following sessions need to be performed in the NSP and NFM-P for the report to be created:
-
a DMM session must be defined with accounting enabled in both the MDM-managed and NFM-P NEs
-
a TWAMP-Light session must be defined with accounting enabled in both the MDM-managed and NFM-P NEs
-
You must enable aggregation using NSP. For more information, see the Telemetry information on the Network Developer Portal and the NSP Data Collection and Analysis Guide.
Report inputs
The following table shows the report inputs.
Table 17-5: OAM-PM Bins and Delay (NSP) report inputs
Report characteristics
The following table lists the principal report characteristics.
Table 17-6: OAM-PM Bins and Delay (NSP) report characteristics
Characteristic |
Value |
---|---|
Data type |
OAM PM statistics |
Source database |
Auxiliary database |
NE types supported |
7210 SAS-M 24F, 7210 SAS-M 24F 2XFP, 7210 SAS-M 24F 2XFP ETR, 7210 SAS-T 12F 10T 4XFP, 7210 SAS-T 12F 10T 4XFP ETR, 7210 SAS-X 24F 2XFP, 7210 SAS-K, 7210 SAS-R6, 7210 SAS-R12, 7210 SAS-S/SX 1/10GE VC 7250 IXR-6, 7250 IXR-R6, 7250 IXR-s, 7250 IXR-10, 7250 IXR-e all 7450 ESS variants all 7750 SR variants all 7950 XRS variants |
Drill-down support |
No |
Examples
The following figures show report examples.