To configure synchronization on a CorEvo card or MSS-1 shelf using SYNC-IO SFPs
Steps
1 |
In the navigation tree Equipment view, right-click on a Wavence shelf equipped with a CorEvo card or the MSS-1 shelf and choose Properties. The Shelf (Edit) form opens. |
2 |
Click on the Timing tab and configure the Secondary Reference Type parameter as Sync-In Port. The Sync In panel is displayed. |
3 |
Select the timing reference in the Sync In panel and click Apply. |
4 |
Click Properties in the Sync In panel. The Physical Port (Edit) form opens. |
5 |
Click on the Timing tab and configure the parameters in the Sync In/Out SFPs panel. |
6 |
Click Apply to save your changes and close the forms. End of steps |