LED operation during the ADP-Hm process
The system Status and Alarm LEDs indicate the current status of the node during the ADP-Hm process. LED operations during the ADP-Hm process describes LED operation during the ADP-Hm process.
ADP-Hm status/phase |
Status |
Alarm |
---|---|---|
Before ADP-Hm starts |
Green (blinking): Indicates that the system is booting up the TiMOS image and running hardware and software diagnostics |
— |
Network discovery |
Green (blinking) |
Amber (one blink followed by a pause). The LTE/3G interface LEDs are also active and provide feedback about the LTE interface (showing link status and signal strength). For more information, see the SAR-Hm and SAR-Hmc Chassis Installation Guide, "7705 SAR-Hm LEDs". |
NSP NFM-P discovery |
Green (blinking) |
Amber (two blinks followed by a pause then repeats). |
NSP NFM-P configuration |
Green (blinking) |
Amber (three blinks followed by a pause, then repeats): This blinking occurs during the one-step or two-step process during the NSP NFM-P configuration phase. |
Green (solid): Indicates that the ADP-Hm process has completed step one of the two-step process and the system is ready to be powered down, installed at its final location and powered back up to complete step two of the two-step process. |
||
ADP-Hm complete |
Green (solid): Indicates one of the following:
|
The Alarm LED displays the current alarm state. For more information, see the SAR-Hm and SAR-Hmc Chassis Installation Guide, "7705 SAR-Hm LEDs". |