Use this procedure to test a DS1 or E1 port at a stand-alone Alcatel-Lucent 1665 DMX shelf or in a Alcatel-Lucent 1665 DMX network.
If this procedure is being used to perform end-to-end testing in a Alcatel-Lucent 1665 DMX network, it is assumed that the complete Alcatel-Lucent 1665 DMX network configuration (BLSR, UPSR, 1+1, Bidirectional 1+1, or Optimized 1+1) has already been established/tested and that only a particular DS1 or E1 port is being tested at this time.
In end-to-end testing, one shelf is referred to as the near end and the other shelf as the far end. These designations are arbitrary; either shelf can be the near-end or the far-end shelf.
Important!
The LNW18 and LNW20 TMUX circuit packs do not support the DS1 port transmission tests.
Important!
The Port Maintenance parameter for the affected ports must be provisioned Allow to perform this procedure. If the Port Maintenance parameter for the affected ports is provisioned Inhibit, loopback and test transmission commands for the affected ports are denied.
To view the Port Maintenance parameter, a Privileged, General, Maintenance, or Reports Only user must select Administration → Allow/Inhibit Port Maintenance to access the required port.
To provision the Port Maintenance parameter, a Privileged user must perform Procedure 7-23: Allow/inhibit port/tributary maintenance.
You must log in as a Privileged or General user to complete this procedure.
In addition to the equipment listed in Required equipment, a DS1 or E1 Test Set is also required.
Prior to performing this procedure:
Refer to Before you begin in this chapter.
Refer to Laser safety and Electrostatic discharge in Chapter 1, Safety.
Obtain the work instructions for this procedure and note the assigned AIDs.
Select View → Equipment to access the required DS1/E1 port and verify that the DS1/E1 port parameters have been provisioned correctly (according to the work instructions) at the terminating Alcatel-Lucent 1665 DMX shelf(s) of the circuit being tested.
If required, select Configuration → Equipment to make DS1/E1 port provisioning changes.
Refer to Procedure 4-9: Provision DS1/E1 circuit packs/ports for service for more information.
Complete the following steps to perform a DS1/E1 transmission test.
1 |
Important! Proper terminating and pass-through cross-connections must exist at each shelf (including stand-alone shelves) to establish continuity for the DS1/E1 circuit being tested. Select View → Cross-Connections to obtain a cross-connection list and verify that the proper VT1.5/STS-n (DS1) cross-connections exist for the DS1 circuit to be tested. If an E1 circuit is to be tested, verify the proper STS-3 cross-connections exist. If required, select Configuration → Cross-Connections to access the Cross-Connection Wizard and create the proper VT1.5/STS-n cross-connections for the DS1/E1 circuit to be tested. Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) TL1 Message Details, 365-372-306 | ||||||||
2 |
Reference: The following figures show the test arrangements. Figure 14-8: Stand-Alone shelf with OLIU loopbackFigure 14-9: Stand-Alone shelf with DSX loopbackFigure 14-10: End-to-End DS1/E1 circuit with far-end loopback | ||||||||
3 |
| ||||||||
4 |
Was the test successful (error free)?
| ||||||||
5 |
Is the protection slot associated with the DS1/E1 circuit under test equipped with a companion circuit pack?
| ||||||||
6 |
Select Fault → Protection Switch command to perform a manual switch from the current active circuit pack to the standby circuit pack. This may cause a hit and register some errors during the switch. | ||||||||
7 |
Was the circuit pack protection switch successful (recovered error free)?
| ||||||||
8 |
Was the test successful (error free)?
| ||||||||
9 |
Are you performing this test for a stand-alone Alcatel-Lucent 1665 DMX shelf or for end-to-end testing within a Alcatel-Lucent 1665 DMX network?
| ||||||||
10 |
Remove any patch cords/fibers used to loop back the circuit under test and disconnect the test set from the DSX-1 panel or equivalent connection point, if required. | ||||||||
11 |
Delete any cross-connections entered to perform this procedure. Reference: Procedure 10-2: Discontinue DS1 or E1 service | ||||||||
12 |
In the System View screen, select Configuration → Update System → Update All to retire existing alarms caused by this procedure. | ||||||||
13 |
If required, repeat Step 1 through Step 12 for each DS1/E1 circuit to be tested. | ||||||||
14 |
STOP! End of Procedure. | ||||||||
15 |
At the near end, disconnect the test set from the DSX-1 panel or equivalent connection point, if required. | ||||||||
16 |
At the near end and far end, delete any cross-connections entered to perform this procedure. Reference: Procedure 10-2: Discontinue DS1 or E1 service | ||||||||
17 |
At the far end, select Fault → Analysis → Loopback to release the terminal loopback, or remove the patch cords at the DSX-1 panel or equivalent connection point for the circuit under test. | ||||||||
18 |
At the near end and far end, select Configuration → Update System → Update All to retire existing alarms caused by this procedure. | ||||||||
19 |
If required, return to Step 1 and repeat this procedure for each DS1/E1 circuit to be tested. | ||||||||
20 |
STOP! End of Procedure. | ||||||||
21 |
Has the circuit pack that failed this test been replaced?
| ||||||||
22 |
Replace the DS1/E1 circuit pack and repeat this procedure. Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) Alarm Messages and Trouble Clearing Guide, 365-372-302 | ||||||||
23 |
Trouble may be in the DSX cross-connect wiring, T1 interface wiring, VT1.5/STS-1/STS-3 cross-connections in the network, or the shelf backplane. If you continue to experience problems, contact your next level of support. Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) Alarm Messages and Trouble Clearing Guide, 365-372-302 End of steps |
November 2011 | Copyright © 2011 Alcatel-Lucent. All rights reserved. |