You must log in as a Privileged, General, Maintenance, or Reports Only user to complete this procedure.
In addition to the equipment listed in Required equipment, the following equipment is also required:
The following lightguide buildouts are required for attenuating the optical ports.
Product Code |
Comcode |
Loss (dB) |
Fiber Type |
Color |
---|---|---|---|---|
ABLCS-05.0 |
108279381 |
5 |
SM |
Yellow |
ABLCS-10.0 |
108279431 |
10 |
SM |
Yellow |
ABLCS-15.0 |
108279480 |
15 |
SM |
Yellow |
ABLCS-20.0 |
108279530 |
20 |
SM |
Yellow |
The following single-mode lightguide angled boot jumpers are available for connecting the optical ports to the optical span.
Product Code |
Comcode |
Length (ft.) |
Connectors |
---|---|---|---|
MS1A40LC-A40LC-2 |
108918269 |
2 |
LC-LC |
MS1A40LC-A40LC-4 |
108918707 |
4 |
LC-LC |
MS1A40LC-A40LC-E/W |
108918715 |
Customer Specified |
LC-LC |
MS1A40LC-LC-2 |
108918830 |
2 |
LC-LC |
MS1A40LC-LC-4 |
108918855 |
4 |
LC-LC |
MS1A40LC-LC-6 |
108918863 |
6 |
LC-LC |
MS1A40LC-LC-8 |
108918871 |
8 |
LC-LC |
MS1A40LC-LC-10 |
108918889 |
10 |
LC-LC |
MS1A40LC-LC-15 |
108918897 |
15 |
LC-LC |
MS1A40LC-LC-20 |
108918913 |
20 |
LC-LC |
MS1A40LC-LC-25 |
108918921 |
25 |
LC-LC |
MS1A40LC-LC-30 |
108918939 |
30 |
LC-LC |
MS1A40LC-LC-35 |
108918947 |
35 |
LC-LC |
MS1A40LC-LC-40 |
108918962 |
40 |
LC-LC |
MS1A40LC-LC-50 |
108918970 |
50 |
LC-LC |
MS1A40LC-LC-E/W |
108918988 |
Customer Specified |
LC-LC |
MS1A40LC-SC-2 |
108919002 |
2 |
LC-SC |
MS1A40LC-SC-4 |
108919010 |
4 |
LC-SC |
MS1A40LC-SC-6 |
108919028 |
6 |
LC-SC |
MS1A40LC-SC-8 |
108919036 |
8 |
LC-SC |
MS1A40LC-SC-10 |
108919044 |
10 |
LC-SC |
MS1A40LC-SC-15 |
108919051 |
15 |
LC-SC |
MS1A40LC-SC-20 |
108919069 |
20 |
LC-SC |
MS1A40LC-SC-25 |
108919077 |
25 |
LC-SC |
MS1A40LC-SC-30 |
108919085 |
30 |
LC-SC |
MS1A40LC-SC-35 |
108919093 |
35 |
LC-SC |
MS1A40LC-SC-40 |
108919101 |
40 |
LC-SC |
MS1A40LC-SC-50 |
108919119 |
50 |
LC-SC |
MS1A40LC-SC-E/W |
108919996 |
Customer Specified |
LC-SC |
MS1A40LC-FC-2 |
108918723 |
2 |
LC-FC |
MS1A40LC-FC-4 |
108918731 |
4 |
LC-FC |
MS1A40LC-FC-6 |
108918749 |
6 |
LC-FC |
MS1A40LC-FC-8 |
108918756 |
8 |
LC-FC |
MS1A40LC-FC-10 |
108918764 |
10 |
LC-FC |
MS1A40LC-FC-15 |
108918772 |
15 |
LC-FC |
MS1A40LC-FC-20 |
108918780 |
20 |
LC-FC |
MS1A40LC-FC-25 |
108918798 |
25 |
LC-FC |
MS1A40LC-FC-30 |
108918806 |
30 |
LC-FC |
MS1A40LC-FC-35 |
108918814 |
35 |
LC-FC |
MS1A40LC-FC-40 |
108918822 |
40 |
LC-FC |
MS1A40LC-FC-50 |
108918848 |
50 |
LC-FC |
MS1A40LC-FC-E/W |
108918905 |
Customer Specified |
LC-FC |
MS1A40LC-EP-2 |
108919713 |
2 |
LC-ST |
MS1A40LC-EP-4 |
108919721 |
4 |
LC-ST |
MS1A40LC-EP-6 |
108919739 |
6 |
LC-ST |
MS1A40LC-EP-8 |
108919747 |
8 |
LC-ST |
MS1A40LC-EP-10 |
108919754 |
10 |
LC-ST |
MS1A40LC-EP-15 |
108919770 |
15 |
LC-ST |
MS1A40LC-EP-20 |
108919788 |
20 |
LC-ST |
MS1A40LC-EP-25 |
108919796 |
25 |
LC-ST |
MS1A40LC-EP-30 |
108919804 |
30 |
LC-ST |
MS1A40LC-EP-35 |
108919812 |
35 |
LC-ST |
MS1A40LC-EP-40 |
108919820 |
40 |
LC-ST |
MS1A40LC-EP-50 |
108919838 |
50 |
LC-ST |
MS1A40LC-EP-E/W |
108919846 |
Customer Specified |
LC-ST |
Important!
The single-mode angled boot lightguide jumpers used to connect the optical ports must be equipped with LC connectors.
The following information is required to determine the required LBO for the OC-N/STM-N lines.
Optics |
Circuit Pack |
Allowable Receiver Range (dBm) |
---|---|---|
Long Reach (LR) Optics |
OM155 1.3LR1(L-1.1) |
-10.0 to -34.0 |
OM622 1.3LR1(L-4.1) |
-8.0 to -28.0 | |
OM622 1.5LR2(L-4.2) |
-8.0 to -28.0 | |
Intermediate Reach (IR) Optics |
OM155 1.3IR1(S-1.1) |
-8.0 to -28.0 |
OM622 1.3IR1(S-4.1) |
-8.0 to -28.0 | |
Short Reach (SR) Optics |
OM155 1.3SR1(I.1) |
-8.0 to -23.0 |
Important!
Avoid excessive bending of the optical jumper used to loop the optical port on itself.
Prior to performing this procedure:
Refer to Before you begin in this chapter.
Refer to Laser safety and Electrostatic discharge in Chapter 1, Safety.
Verify that the correct lightguide buildouts and jumpers are available.
Ensure all optical fiber connectors and couplings have been properly cleaned. Signal performance may be degraded and the fiber interface surfaces damaged if the connections and couplings are not cleaned properly.
Procedure 14-3: Clean optical fibers, dual LC adapters and LC lightguide buildouts (LBOs)
Ensure that technicians are available at both ends of the optical span(s).
Obtain the work instructions for this procedure.
Complete the following steps to connect and verify an OC-N/STM-N optical facility.
1 |
At the near-end Alcatel-Lucent 1850 TSS-5, connect personal computer and establish WaveStar® CIT session. Reference: Procedure 14-2: Connect personal computer (PC) and establish WaveStar® CIT session | ||||||
2 |
Dress optical cables in the fiber tray at bottom front of the shelf. | ||||||
3 |
Route the optical jumpers from the bottom of the shelf. See Single-mode lightguide jumpers. | ||||||
4 |
Establish communication with technician at other end of the optical span. | ||||||
5 |
At both ends of the optical span, remove protective covers from receive and transmit optical jumper cables and clean LC connectors. Important! The Alcatel-Lucent 1850 TSS-5 circuit packs require single-mode lightguide cable. Single-mode optical fibers connecting this shelf with the far-end shelf should not be connected to the circuit pack until at least 45 seconds after an optical loopback is removed. It may take from 15 seconds to 3.5 minutes for the circuit pack FAULT LED and port LED associated with the pluggable transmission module to stop flashing after the cables are connected, depending on the setting of the OC-N/STM-N signal degrade threshold. Reference: Procedure 14-3: Clean optical fibers, dual LC adapters and LC lightguide buildouts (LBOs) | ||||||
6 |
At both ends of the optical span, ensure that only the dual LC adapter is installed on the circuit pack (no LBOs). | ||||||
7 |
Important! Optical connections should be made in the following sequence to speed up the detection of looped-back or crossed-over cables/jumpers. At Node 1 of the optical span, connect the optical fiber transmit cables to the circuit pack OUT connectors. | ||||||
8 |
Have you determined the value of the LBOs for this span?
| ||||||
9 |
At Node 2 of the optical span, measure the optical power of the optical fiber receive cable using an optical power meter. For the allowable receiver power ranges, refer to the Allowable optical receiver power ranges in this procedure. Select the appropriate LBO to build out to the middle of the range. | ||||||
10 |
Install the LBO assembly at the circuit pack IN connector of Node 2. Reference: Procedure 14-5: Install/remove LC lightguide buildouts (LBOs) | ||||||
11 |
At Node 2, connect the input optical fiber to the proper circuit pack IN connector and LBO. Result: It may take from 15 seconds to 3.5 minutes for the circuit pack FAULT LED and port LED associated with the pluggable transmission module to stop flashing after the cables are connected, depending on the setting of the OC-N/STM-N signal degrade threshold. | ||||||
12 |
Did the flashing circuit pack FAULT LED and port LED associated with the pluggable transmission module go off at Node 2?
| ||||||
13 |
At Node 2 of the optical span, connect the optical fiber transmit cables to the circuit pack OUT connector. | ||||||
14 |
Have you determined the value of the LBOs for this span?
| ||||||
15 |
At Node 1 of the optical span, measure the optical power of the optical fiber receive cable using an optical power meter. For the allowable receiver power ranges, refer to the Allowable optical receiver power ranges in this procedure. Select the appropriate LBO to build-out to the middle of the range. | ||||||
16 |
Install the LBO assembly at the circuit pack IN connector of Node 1. Reference: Procedure 14-5: Install/remove LC lightguide buildouts (LBOs) | ||||||
17 |
At Node 1, connect the input optical fiber to the proper circuit pack IN connector and LBO. Result: It may take from 15 seconds to 3.5 minutes for the circuit pack FAULT LED and port LED associated with the pluggable transmission module to stop flashing after the cables are connected, depending on the setting of the OC-N/STM-N signal degrade threshold. | ||||||
18 |
Did the flashing circuit pack FAULT LED or port LED associated with the pluggable transmission module go off at Node 1?
| ||||||
19 |
Disconnect the fiber cable from the OUT connector on the circuit pack at one end of the span. At the other end, verify that the associated circuit pack FAULT LED and port LED associated with the pluggable transmission module are flashing, indicating a loss of signal. Reconnect the fiber and repeat the process for the other direction of transmission. | ||||||
20 |
Select Administration → OSI Routing Map and Administration → OSI Neighbor Maps to retrieve maps of the network. Verify that nodes have been connected properly and that they can communicate with each other. | ||||||
21 |
After all connections and tests have been made, verify optical fiber cables are placed correctly in fiber tray and properly routed in bay framework. End of steps |
Copyright © 2011 Alcatel-Lucent. All rights reserved. |