Complete the following steps to back out an OC-3 UPSR to OC-12 UPSR upgrade at a Alcatel-Lucent 1665 DMXtend node connected to the UPSR using single-rate circuit packs in the Main slots.
1 |
Determine the current status of the upgrade at the node.
| ||||||
2 |
If required, verify the active/standby status of the OC-12 OLIU circuit pack in Main slot M2 and perform manual switches to switch traffic away from an active circuit pack. Reference: Procedure 12-2.3: Verify active/standby status of circuit pack/port to be backed out | ||||||
3 |
Important! This step may be performed if the Main and Function A/B slots were originally equipped with LNW140 OC-3/DS1 circuit packs. If required, verify the active/standby status of the DS1 circuit pack in Function slot A2/B2 and perform manual switches to switch traffic away from an active circuit pack. Reference: Procedure 12-2.4: Verify active/standby status of DS1 circuit pack to be backed out | ||||||
4 |
Important! If the circuit pack is active for timing and/or transmission, opening the latch causes timing and/or transmission switches. Transmission hits (less than 60 ms) will occur for each separate protection switch. Open the faceplate latch on the OC-12 OLIU circuit pack in Main slot M2. Disconnect the optical fibers from the OC-12 OLIU circuit pack in Main slot M2. Reference: Procedure 4-2: Install OLIU circuit packs in Main slots | ||||||
5 |
If required at both ends of the optical span to be backed out, perform the following to connect original OC-3 circuit pack in Main slot M2 and the required OC-3 circuit pack/port at the opposite end of the original OC-3 optical span:
Result: The inc. OC12 LOS alarms clear. Transmission is now supported on the original OC-3 optical span. Reference: Procedure 14-4: Perform connection and verification of optical facility | ||||||
6 |
Important! Perform this step only if the opposite end of the original optical span is an OC-3 port in a Function/Growth group and the Optical Synchronization Source is to be reprovisioned to the original OC-3 port. If required at the opposite end of the original optical span, select Configuration → Timing/Sync to reprovision the Optical Synchronization Source to the original OC-3 port on the OC-3 OLIU circuit pack in slot 1 of the Function/Growth group. Reference: Procedure 6-5: Network Element synchronization provisioning | ||||||
7 |
Important! The UPD/INIT button does not work during this upgrade. At the System View select Configuration → Update System → Upgrade. Select main-2 as the Directed Slot Choice and click OK. Result: A dialog box appears asking you to confirm executing this command. Click Yes.
| ||||||
8 |
If required, verify the active/standby status of the OC-12 OLIU circuit pack in Main slot M1 and perform manual switches to switch traffic away from an active circuit pack. Reference: Procedure 12-2.3: Verify active/standby status of circuit pack/port to be backed out | ||||||
9 |
Important! This step may be performed if the Main and Function A/B slots were originally equipped with LNW140 OC-3/DS1 circuit packs. If required, verify the active/standby status of the DS1 circuit pack in Function slot A1/B1 and perform manual switches to switch traffic away from an active circuit pack. Reference: Procedure 12-2.4: Verify active/standby status of DS1 circuit pack to be backed out | ||||||
10 |
Important! Do not reconnect the optical fibers until instructed to do so. The optical fibers are reconnected after the OC-12 circuit pack/port is backed out at each end of the optical span. If the circuit pack is active for timing and/or transmission, opening the latch causes timing and/or transmission switches. Transmission hits (less than 60 ms) will occur for each separate protection switch. Open the faceplate latch on the OC-12 OLIU circuit pack in Main slot M1. Disconnect the optical fibers from the OC-12 OLIU circuit pack in Main slot M1. Reference: Procedure 4-2: Install OLIU circuit packs in Main slots The following figure shows the state of the current node and the adjacent optical spans. STOP! To complete backing out the UPSR upgrade, return to the procedure that directed you to perform this procedure. End of steps |
November 2011 | Copyright © 2011 Alcatel-Lucent. All rights reserved. |