This is not a standalone procedure. Perform this procedure only as directed by Procedure 9-1: Establish high-speed end-to-end Alcatel-Lucent 1665 DMX network.
Important!
This procedure assumes that the BLSR is established by interconnecting Alcatel-Lucent 1665 DMX nodes using the OC-48/192 Main slot pair. However, the Main slot pair of the Alcatel-Lucent 1665 DMX may also be connected in a BLSR with the Function/Growth slot pair of another Alcatel-Lucent 1665 DMX. If connecting to the Function/Growth slot pair of another Alcatel-Lucent 1665 DMX, refer to Procedure 9-9: Establish subtending low-speed UPSR/BLSR, as required, when performing this procedure.
Nodes are provisioned and optical spans are established individually around the BLSR starting with an Alcatel-Lucent 1665 DMX shelf designated as the starting node. Continue around the BLSR in the same direction until all nodes are provisioned. (Refer to the 2-fiber bidirectional line switched ring worksheet at the end of this procedure when performing this procedure.)
This procedure assumes that all Alcatel-Lucent 1665 DMX shelves have been equipped with the required circuit packs, software has been installed, and the shelf has passed the looped transmission tests. If not, refer to Chapter 5, Node turnup procedures.
Ignore all alarms until the procedure is complete.
Complete the following steps to establish a high-speed OC-48/192 BLSR.
1 |
Important! For BLSR applications, the port Application parameter must be provisioned 2F BLSR. Up to 15 BLSR protection groups may be supported by a single network element when the Main slots are equipped with Very Large Fabric LNW59, LNW82, or LNW504 OLIU circuit packs. From the System View menu at the starting node, select Configuration → Equipment to access the Main 1 and 2 ports and provision the port parameters according to the work instructions. Result: The system reports a default K-bytes alarm. Reference: Procedure 4-4: Provision OLIU circuit packs/ports for service | ||||||
2 |
Select View → Equipment to access the Main 1 and 2 ports and verify that the ports were provisioned correctly. | ||||||
3 |
At each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure), repeat Step 1 and Step 2 to provision and verify the required main OC-n ports. If an Alcatel-Lucent 1665 DMX is using a Function/Growth slot pair, refer to Procedure 9-9: Establish subtending low-speed UPSR/BLSR to provision and verify the required OC-n ports. | ||||||
4 |
From the system view at the starting node,
| ||||||
5 |
From the System View menu,
| ||||||
6 |
At each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure), repeat Step 4 and Step 5 to provision and verify the main 2-fiber BLSR protection group. If an Alcatel-Lucent 1665 DMX is using a Function/Growth slot pair, refer to Procedure 9-9: Establish subtending low-speed UPSR/BLSR to provision and verify the required 2-fiber BLSR protection group. | ||||||
7 |
Determine the status of Automatic Ring Discovery.
| ||||||
8 |
Important! The LAPD Role parameter must be provisioned differently at each end of an optical span. For example, if the LAPD Role parameter is provisioned to user-side at one end of an optical span, then the LAPD Role parameter must be provisioned network-side at the other end of the optical span. From the System View menu at the starting node,
Reference: Procedure 6-4: Provision DCC terminations | ||||||
9 |
From the System View menu, select View → DCC Terminations, verify that the DCC terminations were provisioned correctly, and click Close. | ||||||
10 |
At each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure), repeat Step 8 and Step 9 to provision and verify the DCC terminations for the Main ports. If an Alcatel-Lucent 1665 DMX is using a Function/Growth slot pair, refer to Procedure 9-9: Establish subtending low-speed UPSR/BLSR to provision and verify the required DCC terminations. | ||||||
11 |
Important! Synchronization Autoreconfiguration is only provisionable if the system timing mode is Line and the Sync Messaging parameter of all ports is enabled. If the Sync Messaging parameter is enabled at any port in the network, it must be enabled at all ports in the network. If required at the starting node, provision synchronization functions according to work instructions. Repeat this step at each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure). Reference: Procedure 6-5: Network Element synchronization provisioning | ||||||
12 |
Important! If Remote NE Status is to be used, at least one network element must be provisioned as the Alarm Gateway Network Element (AGNE) in the network. If the network element is designated as the Alarm Gateway Network Element (AGNE), the Alarm Gateway parameter must be provisioned Enabled. From the System View menu at the starting node, select Administration → Set NE, provision the Remote NE Status, Alarm Group, and Alarm Gateway parameters according to the work instructions, and click OK. Result: A dialog box appears asking you to confirm executing this command. Click Yes. Reference: Repeat this step at each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure). | ||||||
13 |
Beginning with the starting optical span (refer to the 2-fiber BLSR worksheet at the end of the procedure), connect the fibers between the Main-2 circuit pack at the starting node and the Main-1 circuit pack at the adjacent East node and verify the integrity of the optical span being established. Reference: Procedure 14-4: Perform connection and verification of optical facility | ||||||
14 |
Perform end-to-end optical line test. Reference: Procedure 14-7: Perform end-to-end optical line test on Main OLIUs | ||||||
15 |
Repeat Step 13 and Step 14 for each optical span in the 2-fiber BLSR (refer to the 2-fiber BLSR example and worksheet at the end of the procedure). If connecting to a Function/Growth slot pair at an Alcatel-Lucent 1665 DMX, refer to Procedure 9-9: Establish subtending low-speed UPSR/BLSR to connect and test the optical span. | ||||||
16 |
| ||||||
17 |
At the starting node, verify 2-fiber BLSR protection switching:
Repeat this step at each node in the 2-fiber BLSR (refer to the 2-fiber BLSR worksheet at the end of the procedure) to verify protection switching. | ||||||
18 |
At each node in the 2-fiber BLSR, click the Alarm List button and verify that no alarms are present. If required, clear any alarms that are present. Reference: Alcatel-Lucent 1665 Data Multiplexer (DMX) Alarm Messages and Trouble Clearing Guide, 365-372-302 | ||||||
19 |
The 2-fiber BLSR is now ready for initial service to be established. Important! Establishing service requires that the proper slots in each terminating node be properly equipped with the correct circuit pack(s) for the type of service being established. It also requires numerous cross-connections in each of the nodes representing the path of the required service. Additionally, transmission tests should be performed to verify the continuity and quality of the established circuit. Reference: End of steps |