This chapter includes procedures to provision non-control plane traditional TDM services. For information about provisioning control plane ENNI and edge traffic, refer to Procedure 9-11: Establish external network-to-network interface (E-NNI).
Procedure 10-1: Establish DS1 or E1 service
Procedure 10-2: Discontinue DS1 or E1 service
Procedure 10-3: Establish DS3 or EC-1 service
Procedure 10-4: Discontinue DS3 or EC-1 service
Procedure 10-5: Make VT1.5 or STS-n cross-connections, single OC-3/OC-12 UPSR configuration
Procedure 10-6: Make Function unit UPSR, hairpin, and Main to Function unit UPSR cross-connections
Procedure 10-7: Make 1+1 (linear extension) cross-connections
Procedure 10-8: Make single-homed cross-connections
Procedure 10-9: Make dual-homed cross-connections
Procedure 10-10: Bridge and roll cross-connections
Procedure 10-11: Establish dual ring interworking (DRI) connections
Procedure 10-12: Provision DS1/DS3 locked cross-connections on a UPSR
Procedure 10-13: Configure LNW20 TMUX/DS3/EC1 applications
Procedure 10-14: Add optical channel (OCH) to DWDM network
Procedure 10-15: Delete optical channel (OCH) from DWDM network
November 2011 | Copyright © 2011 Alcatel-Lucent. All rights reserved. |