Chapter 4: Install and provision circuit packs/OLIUs procedures

Overview

Purpose

This chapter includes procedures necessary to install and provision circuit packs and OLIUs in Alcatel-Lucent 1665 DMX.

Contents

Before you begin

Procedure 4-1: Install SYSCTL (LNW2) in new Alcatel-Lucent 1665 DMX shelf

Procedure 4-2: Install OLIU circuit packs in Main slots

Procedure 4-3: Install OLIU circuit packs in Function slots

Procedure 4-4: Provision OLIU circuit packs/ports for service

Procedure 4-5: Provision unprotected operation on optical ports

Procedure 4-6: Install DS3/EC1 circuit packs

Procedure 4-7: Provision DS3/EC1 circuit packs/ports for service

Procedure 4-8: Install DS1/E1 circuit packs

Procedure 4-9: Provision DS1/E1 circuit packs/ports for service

Procedure 4-10: Install TMUX circuit packs

Procedure 4-11: Provision TMUX circuit packs/ports for service

Procedure 4-12: Install 10/100 Ethernet circuit packs

Procedure 4-13: Install Gigabit Ethernet circuit packs

Procedure 4-14: Provision Ethernet circuit pack/LAN port/VCG for service

Procedure 4-15: Install pluggable transmission modules

Procedure 4-16: Install LNW80 switch pack

Procedure 4-17: Install Fibre Channel circuit packs

Procedure 4-18: Provision Fibre Channel circuit pack/Data port/VCG for service

Procedure 4-19: Provision pluggable transmission module

Procedure 4-20: Provision non-volatile memory cards

Procedure 4-21: Provision STS-n/VT1.5 tributary

Procedure 4-22: Change circuit pack mode of LNW26B, LNW28, LNW77, or LNW121B–159B OC-48 OLIU circuit packs

Procedure 4-23: Replace low-speed circuit pack with different type low-speed circuit pack

Procedure 4-24: Change slot protection state

Procedure 4-25: Install DWDM optical multiplexer/demultiplexer circuit packs

Procedure 4-26: Provision optical transport signal (OTS) port

Procedure 4-27: Provision optical channel (OCH) port

Procedure 4-28: Install 10G Muxponder circuit packs

Procedure 4-29: Provision 10G Muxponder circuit pack/optical channel transport unit (OTU2) port

Procedure 4-30: Provision 10G Muxponder circuit pack SONET/GbE/Data client port

Procedure 4-31: Add subshelf to multishelf Digital Cross-Connect System (DCS) application

Procedure 4-32: Remove subshelf from multishelf Digital Cross-Connect System (DCS) application

November 2011Copyright © 2011 Alcatel-Lucent. All rights reserved.